Permits and Compliance
No unit in Nashville and Davidson County may be listed for short stays until Metro Codes issues it a permit, and each unit in a building is permitted on its own. This service covers the whole cycle: checking whether an address qualifies, assembling the application, the inspection, posting the permit, the yearly renewal, and the day-to-day rules that decide whether the permit survives. Metro names you, the owner, on the permit, which is why you sign the papers and make the calls. Treat what follows as general information and get your own answer from Codes before acting.
- Permit types
- Owner-occupied and not owner-occupied
- Sleeping rooms per permit
- Four at most
- Permit fee
- $313, plus 2.3% on card payments (Metro Codes, 2026)
- Term
- 365 days, renewed yearly
- Inspection
- Fire Marshal for 3+ dwellings; licensed inspector for 1-2 family
- Liability insurance
- $1 million per occurrence or more
On this page
- What the service covers
- Can this address get a permit
- Distance limits and Council exemptions
- Building the application file
- Fire Marshal or licensed inspector
- After the permit issues
- Renewing every year
- When ownership changes
- What can cost you the permit
- Checking a manager's state license
- Who does what
- Questions
- Sources
What the service covers
Rad Stay provides permit and tax compliance support as part of management. In practice that means four jobs. Before you buy or convert, confirm the address can be permitted. Before you file, assemble every document Codes asks for in the format it accepts. After the permit issues, run the unit inside the operating rules and keep the evidence. Before the year ends, renew on time with the tax and insurance proof ready.
You sign the application, the notarized affidavit and, if someone else will apply or operate for you, Metro's owner authorization form, which also has to be notarized.
Can this address get a permit
Zoning decides most cases. Investors and companies need the not-owner-occupied type, and Metro grants new ones only on parcels carrying one of its mixed-use, office, commercial or shopping-center codes, or four Downtown Code subdistricts (North, South, West, Central). The zoning page linked below lists every district by name. DTC East is left out. House zones such as RS, R, RM and AR2a take no new investor applications. Two newer districts, RN and RL, written into the code in December 2025, accept only the owner-occupied kind, and only for a single-family building.
Three more checks follow. Any zoning code ending in NS rules out every kind of rental permit. Where an SP (specific plan) or a PUD covers the land, its own text has to permit the use, and Codes refers questions on those conditions to Metro Planning. Finally, count sleeping rooms: four is the ceiling for any one permit, and a unit with five or more is ineligible.
The owner-occupied type is for an individual who makes the property home, shown with four current papers such as a Tennessee license and a bank statement. LLCs and trusts cannot hold them. Metro Codes offers a property search that tells you which permit, if any, a location can get.
Distance limits and Council exemptions
A new investor permit is refused when less than 100 feet separates your parcel from a park, a school, a house of worship, or a day care center with a state license, with school and day care playgrounds counted too. Codes takes that measurement between the two property lines, not between buildings.
Metro Council can exempt a property by resolution. To get an exemption, the applicant pays to mail a notice to every owner inside a 600-foot radius and to post a sign for 14 days before the public hearing, then needs 21 yes votes on the Council; one resolution can list several units on a single parcel or in a single multifamily complex, provided one owner files for them together. Legistar shows the exemptions still moving in 2026, with three units at one Second Avenue North address approved at the September 1 and October 6 meetings. At one downtown address, Council voted down a 62-unit resolution in June 2024 and passed a 55-unit one there four weeks later. Plan for the hearing calendar if your parcel needs one.
Building the application file
Since March 11, 2026, applications go through Metro's online ePermits system, and the steps run in order. Codes asks applicants not to submit twice and to have every document ready, because an online application cannot be saved and resumed. Identity papers for owner-occupied permits, and the operating agreement or articles that tie a person to an owning LLC, go by email instead of the upload.
Expect to draw every floor, hand sketches are accepted, marking each room, door, window and detector. The detectors must be UL 217 listed and placed in bedrooms, on the route from bedroom to exit and on each level, garage and basement too. Add a paid property tax record, liability coverage with a $1 million minimum for each occurrence (Codes will accept a platform's host coverage, shown with the profile page), the association statement Codes wants even where there is no association, and the name of a local contact within 25 miles.
Neighbor notice is often the slowest part. Every neighbor that touches the unit, up, down and sideways as well as front and back, gets a letter before filing. Either the neighboring owner signs it or it goes certified to wherever that owner receives mail. The green certified-mail receipt must be filled out completely and scanned with the letter.
Fire Marshal or licensed inspector
The kind of inspection follows the building type. A detached house or a two-unit property needs a signed statement from an engineer, an architect or a home inspector holding a Tennessee license that the safety items are in place; Codes will not issue without it. Where a lot holds a triplex or anything larger, the Fire Marshal inspects once Codes has opened the application.
Codes' shortcut is the front door: reached from a corridor or breezeway that other residents share, it means a fire inspection. Book that inspection as soon as the application number is issued, since the permit cannot close without it.
After the permit issues
Codes says plainly that a property may not be advertised on a rental website until the permit arrives. From then on the permit's number, or a photo of its placard, appears in every ad, and a notice inside the door gives the guest cap and the local contact's phone.
Day to day, a single booking occupies the unit, the person who books is 21 or over, nobody pays for under a day or stays past a month, the host serves no food, and no RV, bus or trailer is parked in sight. The guest limit is double the permitted bedrooms, add four, never above 12. Calls to the local contact get answered at 3 a.m. as well as 3 p.m.
Renewing every year
A permit lasts 365 days from issue. Two automatic reminder emails go out, at the two-month mark and again about six weeks out, each linking the affidavit; nothing is renewed until payment clears. Codes does not reissue a new permit; it extends the existing one by a year from the original issue date, and the placard can be printed again from ePermits.
The code lets Metro grant some days of grace past the expiration date when no complaints are on file, but that is Metro's choice, not a right. Treat the expiration date as the deadline and file in the 60-day window.
When ownership changes
The named holder owns the permit, and Metro will not let it move to anyone else. Deeding the property to someone else ends it, and Codes applies that even when you retitle into an LLC or trust of yours, or take title back out of one. Whoever owns next starts a fresh application under that day's code. Older investor permits that survive in house zones may still be renewed by their holders, and they end at a sale.
Back in December 2023, Codes posted a summary saying an LLC that owned the property and was issued the permit could change its members and keep the permit, since Metro does not regulate who belongs to an LLC. Council then amended the code in November 2024 (BL2024-478). Under that wording, once the zoning administrator decides that an ownership change has occurred under the state law definition, the permit is void from then on, and whoever owns next must file a fresh application, reviewed under the regulations current when Codes receives it. The ordinance does not mention LLC membership, so get Codes' answer by email before you build a sale, a new partner or an estate plan on the 2023 summary.
What can cost you the permit
If the rental racks up three violations of laws of general application, Codes or a court can revoke the permit on 15 days' notice in writing, and a year must pass before another is granted. A zoning administrator's decision can be appealed to a separate Metro board that hears rental cases. An unpermitted rental is fined $50 for every day, with a one-year bar on applying; operating after a permit has expired means waiting six months.
Neighbors file complaints through Metro's complaint process. Tennessee's Short-Term Rental Unit Act, as summarized by the University of Tennessee's MTAS, requires localities that take complaints to warn that a false one is punishable as perjury, and a clear log of guest stays, noise alerts and responses is what you show when a complaint is disputed.
Checking a manager's state license
Separately, a business that books and runs other owners' homes for guests staying 14 days or less needs a state firm license as a vacation lodging service, issued through the Real Estate Commission, and it keeps one licensed designated agent (state code section 62-13-104). Guest payments go into an escrow or trust account, and owners must be paid from it at least once each month. A Metro permit says nothing about the manager's license, so check the second one yourself.
Who does what
- You: sign the application, affidavit and authorization; carry the insurance; keep property taxes current.
- The manager: check eligibility, assemble the file, send neighbor notices for your signature, book the inspection, post the permit, track the renewal.
- The responsible party: answer calls at all hours during stays and fix problems at the unit.
- Your attorney or CPA: entity structure, sale terms and tax treatment.
Union Street Lofts, four short-term rental lofts at 329 Union Street in the Printers Alley block, run by Rad Stay since 2023.
- 4.98average rating across 214 Airbnb reviews of the four lofts
- Guest Favoritebadges on the lofts' Airbnb listings, with Superhost status
- 4 of 4lofts hold Metro non-owner-occupied permits, issued April 2023
- WKRN News 2segment on the lofts, published June 11, 2026
Airbnb figures from the four listings as read October 4, 2026. Permits from Metro Codes. Read the case study · See the portfolio
Questions
Can I start listing while my application is pending?
No. Codes says you are not authorized to list a property on a rental website until the permit has been issued.
Does each unit in my building need its own permit?
Yes. Codes treats every unit separately: its own $313 fee, its own anniversary, its own number in the ad, and a four-bedroom ceiling.
Will Metro permit every unit in my building?
As many as qualify; no such cap appears in the code. Private documents can impose one, such as a condo declaration, bylaws, a ground lease or a loan covenant, and each application carries your statement that none is breached.
Can a buyer keep my permit after closing?
It ends. Your buyer files from scratch, so what the zoning allows and what sits within 100 feet count for more than your booking record.
What if my renewal email went to spam?
Renewal is still your responsibility. Codes says owners can look up the permit at any time in ePermits, and the renewal affidavit can be emailed to Codes directly.
Sources
- Metro Codes, Apply for Short Term Rental Property Permit (updated Oct. 1, 2026; Wayback copy Nov. 5, 2026)
- Metro Codes, Not-Owner Occupied Checklist (Wayback copy Feb. 16, 2026)
- Metro Codes, Permit Types (Wayback copy Feb. 17, 2026)
- Metro Codes, Operation Rules and Requirements (Wayback copy Feb. 12, 2026)
- Metro Codes, Renew Short Term Rental Property Permit (updated March 11, 2026; Wayback copy Oct. 12, 2026)
- Metro Codes, Short Term Rental Property Frequently Asked Questions (Wayback copy Oct. 22, 2026)
- Metro Codes, Not Owner Occupied Non-Conveyance Summary (Dec. 2023; Wayback copy Oct. 23, 2026)
- Nashville Fire Department, Short Term Rental Inspection Information (Wayback copy Oct. 22, 2026)
- Metro Code Chapter 6.28 (Municode, version of June 23, 2026)
- Metro Code 17.08.030 zoning land use table (Municode)
- Metro Council Legistar, matters RS2026-2222, RS2026-2223 and RS2026-2293 (read Nov. 12, 2026)
- University of Tennessee MTAS, Summary of the Short-Term Rental Unit Act (reviewed July 9, 2026)
- Tenn. Code Ann. 62-13-104, FindLaw copy current as of Jan. 2, 2024
- Metro Council Legistar, BL2024-478 amending Chapter 6.28 (final passage Nov. 7, 2024; text read Nov. 12, 2026)
- Metro Council Legistar, RS2024-479 (failed June 4, 2024) and RS2024-580 (passed July 2, 2024), read Nov. 12, 2026
Checked November 12, 2026.
To keep this page, print it or choose Save as PDF in your browser's print window. The printout keeps the sources and the date.
More services
All 15Pricing and Revenue Management
Revenue management means deciding a price, a minimum stay and a set of booking rules for every night on the calendar, then changing them as demand moves.
Channel Management Across Airbnb, Vrbo, Booking.com and Expedia
Channel management is running one unit on several booking sites at once without selling the same night twice.
Cleaning and Turnovers
A turnover is the few hours between one checkout and the next arrival, when a unit is cleaned, restocked, checked and reset.