East Bank
The East Bank is the strip facing downtown over the river, where the Titans play now and where a new enclosed stadium, a master-planned district and an Oracle campus are going up. Almost none of it is built-out housing yet, so an owner here is buying into a plan. This page covers where it starts and stops, the zoning that settles whether nightly rentals can happen, the permit counts, and what to check before committing to a building.
- Where
- East bank of the Cumberland River, across from downtown
- Stadium address
- 1 Titans Way
- Redevelopment area
- About 550 acres of public and private land, of which Metro owns about 130 (WSMV, April 2024)
- Zoning layers to know
- CF, MUG, MUG-A, MUI, MUI-A, IR, IG, SP
- Issued STR permits, ZIP 37213
- 1 (0 owner-occupied, 1 non-owner-occupied)
- Issued STR permits, ZIP 37206
- 667 (371 owner-occupied, 296 non-owner-occupied)
- Data date
- Metro open data, status Issued, retrieved 2026-10-06
On this page
- Where the East Bank is
- How the area developed
- The plan Metro adopted
- Buildings and housing today
- Zoning on the East Bank
- What the STR rules mean for a building here
- Issued permits in the nearby ZIP codes
- Who visits and why
- Longer stays on the East Bank
- Development, 2023 to 2026
- Getting around
- Flood risk
- Building types that fit
- Checks before an East Bank purchase
- Rad Stay on an East Bank building
- Questions
- Sources
Where the East Bank is
The East Bank is the east side of the Cumberland River, directly across from downtown Nashville. Wikipedia gives the current Nissan Stadium's address as 1 Titans Way, facing downtown from the far bank. WSMV's April 2024 coverage of the master developer agreement lists 550 acres of public and private land in the East Bank redevelopment, of which Metro owns 130 acres. That is the larger of the two numbers you will see.
Other sources draw the area smaller. WPLN's 2022 reporting on the vision plan described roughly 300 acres, and officials told the station that about a third of it is asphalt. The difference is a matter of what gets counted. For an owner, the East Bank has no single official boundary like a historic district, so work from a parcel number and a zoning map rather than the name.
On the Rad Stay permit data, the East Bank does not have a ZIP code of its own that we could confirm from a source we opened. Metro's permit file is organized by ZIP, and the section below on issued permits shows the codes closest to the area. Before you rely on any ZIP-level number, look up your parcel's ZIP on its tax bill or the Metro property assessor record.
How the area developed
For most of its history the East Bank was the working side of the river: industry, parking and open ground, with downtown's streets and hotels on the other bank. WPLN reported in 2022 that the vision plan describes the area as largely asphalt, and that its core goals include flood management and restoring the riparian zone, the strip of natural bank along the water, which the article says has been stripped and covered with impermeable surface.
The stadium is the anchor. Ground was broken on the current stadium on May 3, 1997. A tornado that hit downtown on April 16, 1998 destroyed several cranes at the site, and the stadium opened on August 27, 1999 at a cost of $290 million. It has carried four names: Adelphia Coliseum from 1999 to 2002, The Coliseum from 2002 to 2006, LP Field from 2006 to 2015, and Nissan Stadium since 2015. Metro owns it. The Titans and Tennessee State University football have played there since 1999, and the Music City Bowl has been held there since 1999.
Industry stayed on the north half of the area. One large example is a metal-recycling yard on the river that has operated since the early 1960s. In August 2025 a group of Tennessee investors, TEB LLC, organized by an ARRT Global investment fund, bought the 47-acre site from Icahn Enterprises for a reported $245 million. The trade press article reporting the sale said plans for redevelopment had not been disclosed. It noted that Oracle bought more than 65 acres of East Bank land in 2021.
The plan Metro adopted
The Imagine East Bank vision plan is a concept. WPLN described the 80-page document in 2022 as covering the next 20 to 30 years, with the first work aimed at flood management and the river bank. Treat any acreage figure as approximate and ask for the current number if it matters to a deal.
Metro chose The Fallon Company as master developer for a 30-acre Initial Development Area of Metro-owned land, and the Metro Council approved the master developer agreement unanimously in April 2024, according to WSMV. The approved plan calls for 1,550 residential units, of which 695 are affordable at 80 percent of area median income and below. Estimated infrastructure for the area was put at $147 million, split among Fallon at $72.6 million (49 percent), the Tennessee Performing Arts Center at $67.6 million (46 percent) and Metro at $6.8 million (5 percent).
The same Council meeting passed a resolution on a memorandum of understanding for a performance space for the Tennessee Performing Arts Center on East Bank property. We could not open Metro's own project pages, so we do not state street names, parcel letters or district names for the plan.
Buildings and housing today
This is the section where the East Bank differs most from the neighborhoods that border it. There is almost no existing multi-unit housing stock on the East Bank to buy or convert. The sources we opened describe parking lots, industrial uses and a stadium, and they name no existing apartment, loft, hotel or condominium building within the redevelopment area. We are not going to invent one. If you hear that a building here is available, ask for the parcel number first and look up its zoning and use.
What does exist is a planned housing and lodging pipeline, and the sources are specific about two pieces of it. Fallon and the local developer Elmington have been working on a mixed-use affordable housing building beside the new stadium. WSMV reported in October 2025 that it would hold more than 300 affordable units, a daycare, retail space and parking, with building permits to be submitted that December, a groundbreaking expected by May and completion targeted for late 2028. We could not confirm from a source whether the groundbreaking took place.
The second piece is a hotel. WSMV reported on September 22, 2026 that a planned 600-room hotel next to the new stadium will not be ready for the 2030 Super Bowl. Construction is slated to begin around July 2027, with an opening in summer 2030. The development authority for the East Bank is weighing three paths: keep building while limiting game-day disruption, build the garage first, or hold the hotel until after the Super Bowl. Its next meeting was set for October 27. For context, WSMV cited Nashville's Downtown Partnership directory at about 67 lodging properties with roughly 14,100 rooms downtown. Super Bowl crowds are expected to reach about 500,000 people in the area.
At the north end, Oracle is building its headquarters campus on land it began buying in 2021. A WBIR report on the plan gives 8,500 jobs, and the company's schedule runs to 2031. We could not open the more detailed 2026 site-plan reporting, so we do not state a cost, building count or acreage for the campus.
Zoning on the East Bank
Metro's East Bank zoning layer shows a mix of districts: CF, MUG, MUG-A, MUI, MUI-A, IR, IG and SP. They matter because zoning, not the neighborhood name, decides a Nashville permit.
East Bank zoning is mostly MUG, MUI and their -A forms, CF, and industrial IR and IG; the mixed-use and CF districts can receive absent-owner permits with conditions, as our zoning guide explains. Industrial zoning is left off. IR and IG, both on the East Bank map, are blank for both permit types in the use table, save a narrow exception for an owner-occupied permit tied to artisan or manufacturing housing. Downtown Code districts are a separate case: four of them qualify, but DTC East does not.
Specific Plan zoning, shown as SP, is the one to read closely, because large redevelopment sites are often rezoned to SP. Metro states that permits for SP-zoned properties are issued only if the SP allows them. Council bills have amended SPs to allow absent-owner rentals, once in 2024 and again in 2026, which shows the question gets settled parcel by parcel. If a seller describes a development as zoned for short-term rentals, ask for the SP document and the section that says so.
NS districts, the no-short-term-rental variant of commercial zoning, prohibit both permit types. A parcel zoned with an NS suffix cannot be permitted at all.
What the STR rules mean for a building here
Each unit needs its own permit, and Metro will not permit any home with more than four bedrooms. No rule caps the permitted share of a building, so an eligible building could in principle permit every unit. The Fire Marshal inspects buildings that have three dwellings or more. Metro's February 2026 FAQ gave a $313 fee, and each permit lasts a year.
Distance is where East Bank buyers get caught. Churches, schools, parks and licensed day cares within 100 feet block new absent-owner permits. The East Bank plan includes public greenspace and the Elmington building includes a daycare. A park or day care opening near a building can affect any later application, so measure against what is planned as well as what stands today. Council can waive that, and usually has since 2023; see our multifamily guide.
The operating rules that shape a building's economics are in the same section. Each permitted unit then follows Metro's countywide operating rules, also set out in that guide. Rad Stay's guide to short-term rental permits for multifamily buildings covers these rules in more detail.
A permit cannot be transferred. A sale ends every permit, so does a transfer into a trust or LLC, and the buyer applies again. Neighbors on every side, above and below included, must get written notice before filing. Violations can cost a permit, and renting with none brings daily fines.
Condominium and lease documents sit on top of Metro's rules. Every applicant also certifies that the lease, bylaws and association agreements allow renting. Associations can be stricter than Metro, its FAQ says. In a new East Bank condominium or mixed-use building, read the declaration before the zoning.
Issued permits in the nearby ZIP codes
Countywide, Metro's open data listed 7,022 issued permits on October 6, 2026. We did not confirm from a source which ZIP code a given East Bank parcel falls in, so use the table as a reference and check your parcel.
ZIP 37213 shows 1 issued permit, a non-owner-occupied one. ZIP 37206 shows 667, of which 371 are owner-occupied. ZIP 37203, across the river, shows 1,706, with 89 owner-occupied. ZIP 37201, the downtown core, shows 346, with 8 owner-occupied.
The comparison is the useful part. ZIPs 37203 and 37201 are dominated by non-owner-occupied permits, while 37213 has almost none. ZIP 37206 is mixed, with 371 owner-occupied permits against 296 non-owner-occupied. Permit counts are a record of permits Metro issued. They say nothing about occupancy or income.
Who visits and why
The visitors are event visitors. The current Nissan Stadium holds 69,143, and its attendance record is 73,874 for Ed Sheeran on July 22, 2023. The venue has hosted the Titans and Tennessee State since 1999, the Music City Bowl, CMA Fest's main stage each June, and in recent years the 2022 NHL Stadium Series, SummerSlam 2022, the IndyCar Music City Grand Prix from 2021 to 2023 and Monster Jam World Finals XXII in 2023. The final Titans home game in the current stadium is scheduled for January 3, 2027.
The new enclosed stadium changes the calendar, because a roof means it can host events regardless of weather. The Titans say it seats about 60,000, will not have a retractable roof, and is built to host events such as Super Bowls, Final Fours, College Football Playoff games and WrestleMania. The NFL awarded it Super Bowl LXIV, to be played in 2030, on May 19, 2026. The Titans list its opening as anticipated in 2027.
The stadium is financed in part by guests. The $2.1 billion stadium is funded by $840 million from the Titans, $500 million from Tennessee and $760 million of Sports Authority revenue bonds, to be repaid from seat licenses, taxes collected at the stadium and a new hotel-motel tax of 1 percent. Ground was broken February 29, 2024, after the April 2023 Council vote on the financing.
Longer stays on the East Bank
Mid-term demand here will follow employers, and the employer with a number attached is Oracle, with 8,500 jobs planned by the end of 2031. Construction on the stadium, the Fallon district and the campus also brings project workers who often need 30-day-plus housing, though we have no source that sizes that demand and we do not forecast it.
We have no dated East Bank or downtown rent figure from a source we opened, so we state none. No East Bank rent figure exists yet because there is little completed housing to measure. The affordable component matters for a different reason: of the 1,550 planned units in the Fallon area, 695 are to be affordable at 80 percent of area median income and below. That supply will compete for tenants at the lower end of the market.
Where nightly permits are not possible, monthly stays still work, since permitted stays run 30 nights at most. That is the mid-term product Rad Stay manages alongside short-term and long-term. Ask Metro Codes about the parcel before planning around it.
Development, 2023 to 2026
The dates, in order, from the sources we opened: April 25, 2023, the Council approves the stadium financing 26 to 11. February 29, 2024, ground is broken on the new stadium. April 2024, the Council approves the master developer agreement with Fallon. August 2025, the 47-acre river scrapyard sells for a reported $245 million. October 2025, WSMV reports the Elmington affordable building's timeline. May 19, 2026, the NFL awards Super Bowl LXIV to Nashville. August 24, 2026, News Channel 5 reports construction on schedule. September 22, 2026, the hotel delay is reported.
The August 2026 update to the Metro Sports Authority, as News Channel 5 reported it, said crews were working toward enclosing the stadium by the middle of October, roof work was continuing, and installation of the 60,000 seats was expected to start in September at roughly 10,000 per month. Construction on the Seigenthaler Bridge Connector was expected to begin in November and finish by the end of 2027.
Schedules move. The hotel is now later than earlier plans, and the Elmington timeline comes from 2025 reporting we could not update.
Getting around
The John Seigenthaler Pedestrian Bridge is the direct connection to downtown. It opened as a vehicle bridge on July 5, 1909, is 3,150 feet long, and was closed to vehicles in 1998. After conversion, at a cost of more than $15 million, it carries a 15-foot center lane for bicycles with 10-foot sidewalks on each side. Wikipedia says the original bridge was built one block south of Broadway, and that its east end has a pedestrian plaza very close to Nissan Stadium. The same article puts the Hall of Fame, Music City Center and Bridgestone Arena near its west end. The Woodland Street Bridge, next to the bus stop on Woodland Street, is the other crossing WeGo points to.
WeGo Public Transit lists Routes 4, 14, 23, 41 and 56 as getting close to the stadium, with drop-off and pick-up on Woodland Street and South 1st Street near the Woodland Street bridge. Fares are free on all local bus routes on Titans home game days. The return train to Lebanon leaves Riverfront Station one hour after the game ends. Check wegotransit.com before an event, because these arrangements change from season to season.
Parking is a planning variable. The Titans' FAQ says the new stadium will have less parking directly at the stadium than the current one, with preferred partner parking lots nearby. On event days put walking directions and a parking note in your check-in message, and tell guests which bridge to use.
We could not source a driving distance from the East Bank to Nashville International Airport, so we are not stating one.
Flood risk
The East Bank sits on the river, and the river has risen into the stadium before. On May 3, 2010, Cumberland River flooding put about six feet of water on the playing surface of the stadium and reached its locker rooms, as Wikipedia reports.
WPLN reported that the vision plan allows some development in the floodplain with raised elevations. A buyer should pull FEMA's flood map and Metro Water Services floodplain data for the parcel, ask the seller for any elevation certificate, and price flood insurance before due diligence ends.
Building types that fit
Given what the sources describe, three building types are realistic here. The first is new mixed-use buildings: apartments over retail in a mixed-use district, with the permit question answered by the parcel's zoning and the declaration. The second is lease-up buildings, new apartment buildings in their first year of renting up, where an owner may want furnished mid-term units while the building fills. The third is hotel or extended-stay product, which the planned 600-room hotel shows is being pursued and which is a different asset class from a rental building.
The sources we opened name no existing historic lofts or small apartment buildings on the East Bank. For a small apartment building, look at the neighboring markets.
Checks before an East Bank purchase
These checks draw on the sources above and the code as it read through June 23, 2026.
A parcel can look fine on a map and still fail one of them.
- Zoning district and any SP document, including whether the SP allows absent-owner rentals and whether an NS suffix applies
- The 100-foot distance to parks, schools, churches and licensed day cares, including those planned in the Metro vision plan and around Fallon
- Flood zone, elevation certificate and insurance quote, given the 2010 flood
- Condominium declaration, association bylaws and leases that could bar rentals even where Metro would permit them
- Whether the building has three or more dwellings, which brings the Fire Marshal inspection
- Event-day access: street closures, bridge use, parking and noise from the stadium and the planned hotel garage
- Construction schedule risk on neighboring parcels, including the hotel and the Elmington building
- Ownership: permits are not transferable, and moving title to a trust or LLC ends them
Rad Stay on an East Bank building
Rad Stay's flagship is Union Street Lofts downtown, and it manages stays of every length. It prefers nightly rentals and turns to longer leases where nightly ones are barred or do not fit. For an East Bank building, the work would be pricing tied to the event calendar, guest messages, cleaning for the morning after big events, booking automation, damage cover, and permit and tax work, plus management of commercial, industrial and warehouse property and reviews of East Bank buildings an owner may purchase, lease or partner on.
Because the district has few completed buildings, the useful first step is a review of the parcel, its zoning and its permit path, before any management plan. We do not forecast income, and we do not state results for any property we have not run.
Questions
Can an East Bank building be permitted for short-term rental?
That depends on the parcel's zoning. For an absent owner, possibly in the mixed-use and CF districts, with conditions. IR and IG are excluded, and SP parcels qualify only if their plan allows it. The distance rule applies as well. Confirm with Metro Codes.
What permit counts are there near the East Bank?
On October 6, 2026, ZIP 37213 had one, 37206 had 667, 37203 had 1,706, and 37201 had 346. We could not confirm from a source which ZIP a particular East Bank parcel is in, so check the parcel.
When does the new Nissan Stadium open?
The Titans list the opening as anticipated in 2027, and News Channel 5 reported in August 2026 that construction was on schedule. The final Titans home game in the current stadium is scheduled for January 3, 2027. The NFL has awarded the new stadium Super Bowl LXIV in 2030.
Will the East Bank hotel be open for the 2030 Super Bowl?
WSMV reported on September 22, 2026 that the planned 600-room hotel will not be ready. Construction is slated to begin around July 2027, with an opening in summer 2030. The East Bank Development Authority was weighing options for limiting disruption on game day.
Is the East Bank in a flood zone?
Parts of it are low land beside the Cumberland River, and the river put about six feet of water on the stadium field in May 2010. WPLN reported that the vision plan allows some development in the floodplain with raised elevations. Check the FEMA map and an elevation certificate for the exact parcel.
How do guests get from the East Bank to Broadway?
Most walk across the John Seigenthaler Pedestrian Bridge, which was built one block south of Broadway. WeGo also lists Routes 4, 14, 23, 41 and 56 as getting close to the stadium, and the Woodland Street Bridge is a second crossing.
Sources
- Tennessee Titans, New Stadium FAQ
- Wikipedia, Nissan Stadium (2027)
- Wikipedia, Nissan Stadium (Nashville)
- Wikipedia, John Seigenthaler Pedestrian Bridge
- WSMV, Flagship hotel in Nashville won't be ready in time for Super Bowl 2030 (Sept. 22, 2026)
- WSMV, Company shares timeline on affordable housing project on Nashville's East Bank (Oct. 29, 2025)
- WSMV, Nashville's East Bank development agreement approved (April 17, 2024)
- WPLN, The Cumberland River is degraded; can Nashville's 300-acre redevelopment plan help restore it (Aug. 26, 2022)
- REBusiness, Local investment group buys 47-acre scrapyard site in Nashville's East Bank area (Aug. 18, 2025)
- WeGo Public Transit, Titans game day service
- News Channel 5, New Nissan Stadium remains on schedule as crews prepare for seats, bridge connector work (Aug. 24, 2026)
- WBIR, Oracle to bring 8,500 jobs, invest $1.2 billion in Nashville
- Metro Code 6.28.030, Short term rental property permit (Municode, current through June 23, 2026)
- Metro Codes, Short term rental permit types (Wayback copy, Feb. 17, 2026)
- Metro Codes, Short term rental frequently asked questions (Wayback copy, Feb. 11, 2026)
- Metro Nashville Residential Short Term Rental Permits (open data), status Issued, retrieved 2026-10-06
Checked October 18, 2026.
Photo: Quintin Soloviev, CC BY 4.0, via Wikimedia Commons. Cropped.
To keep this page, print it or choose Save as PDF in your browser's print window. The printout keeps the sources and the date.
More markets
All 28
East Nashville
East Nashville covers the big stretch on the far bank of the river from downtown, and the rules can flip between neighboring streets.

Edgefield
Edgefield is East Nashville's old riverside neighborhood, in ZIP 37206, facing downtown over the Cumberland.

Five Points
Five Points is the commercial crossroads of East Nashville, where Woodland Street, North 11th Street and Clearview Avenue meet.