How Long Nashville Short-Term Rental Permits Last
Metro Nashville's public file lists short-term rental permit records back to 2015. We pulled it on November 3, 2026 and measured how long each permit stayed alive. Of the permits that reached their first expiration, 82.9% renewed, and fewer than half remain after the fourth. If you own or plan to buy a Nashville building, those rates show how often a permit ends and what you need to protect.
- Source
- Metro Nashville permit file, ArcGIS open data
- Date pulled
- November 3, 2026
- Permits with an issue date
- 16,075
- Issued today
- 6,996
- Renewed at first expiration
- 82.9%
- Median life
- About four years
- Median age of permits in force
- 4.7 years
On this page
- Main Findings
- How a Permit Term Works
- Method
- Records With No Issue Date
- Outcomes by Issue Year
- Survival by Expiration Number
- Renewal Rates by Calendar Year
- Building Size and Parcel Type
- How Permits End
- New Permits at the Same Address
- Steps for Owners and Buyers
- What the Data Cannot Show
- Questions
- Sources
- Cite this study
Main Findings
Every figure below is our own count of Metro's file. Dates and rates cover the file as it stood on the day of the pull.
- The file holds 16,075 permits with an issue date. Today 6,996 are issued (43.5%), 6,741 expired (41.9%), 2,117 canceled (13.2%) and 164 revoked (1.0%). Another 57 carry rarer labels.
- At the first expiration, 82.9% of permits renewed. At the second, 79.1%. From the sixth through the tenth expiration, more than 90% renewed each time.
- Only 46.9% of permits are still in force after the fourth expiration, which puts the median life at about four years. Owner-occupied permits run about three years, and not-owner-occupied permits run between four and five.
- Rates moved with the calendar: 71.9% of permits due in 2020 renewed, 91.5% of those due in 2024, and 87.7% of those due from January 1 to October 4, 2026.
- Permits in force today have a median age of 4.7 years. 3,046 are at least five years old, and 414 are at least ten.
- When a permit ended, a later permit appeared at the same exact address 27.4% of the time, and 68.4% of those pairs show a different owner name.
How a Permit Term Works
Metro Code gives a permit 365 days from its issue date. Reminder emails go out 60 days and again 45 days beforehand. After that date the zoning administrator may allow a 30-day grace period, but only with no documented complaint during the latest term and a reason other than neglect or mistake. NewsChannel 5, reporting on Metro Codes data in February 2020, also described a yearly cycle.
The file has no renewal log, but its dates show how renewals are recorded. A permit keeps its number and issue date, and the expiration date moves forward. Metro's renewal page said as much in a copy archived October 12, 2026: a holder gets no new permit, and the existing one runs another year from the original issue day and month. Of the 16,054 permits we could measure, 99.0% show a span from issue to expiration that lands on a whole number of years or about 30 days past one. Only 41 of 16,075 show an issue date more than a year after the entry date, so Metro does not appear to re-date permits at renewal. A span of five years therefore reads as five terms.
Method
Our source is Metro's layer titled Residential Short Term Rental Permits, read from its ArcGIS service on November 3, 2026. The steps ran as follows.
- Repeats. The 17,634 rows we received hold 17,603 different permit numbers, so each number keeps one row.
- No issue date. 1,528 records lack one. Without them, 16,075 permits remain.
- Bad dates. Duration figures drop 21 more: 11 with expiration dates after 2028, some as late as 2099, 5 with expiration before issue and 5 with spans under 300 days. That leaves 16,054.
- Terms. We counted each span in whole years, and a span within 90 days of the next full year counts as that year. 1,722 permits run about 30 days past a whole year, and they count as the whole year.
- Renewal test. At each expiration a permit counts as renewed if its span runs past that date. A permit still issued leaves the count at an expiration that has not arrived. We also left out 50 expired permits dated within 30 days of the pull, since a grace period could still apply.
- Canceled and revoked. The file gives no date for these, so each counts as not renewed at its last recorded term.
- Rare labels. Records marked EXPIREEXT, HOLD or OK TO PAY leave the count at their last term. Denied and refunded records count as not renewed.
- Still in force. We multiplied the renewal rates in order to get the share surviving each expiration.
- Permit types. Two file labels mean not owner-occupied, so we merged them.
Records With No Issue Date
Anyone counting expired rows in this file starts with 8,041. That overstates lapsed permits, because 1,300 of those rows have no issue date. The whole no-date group is 1,528: besides those 1,300, it takes in 159 canceled, 35 pending, 27 denied, 5 held and 2 voided records.
Of those 1,528, 1,523 have permit numbers that begin with T, and the median gap from entry to expiration is 90 days. Those look like applications that ran out before approval, but nothing in the file confirms it. NewsChannel 5 ran into the same gap in February 2020 and noted that many records lacking an issue date were listed as expired. Expired permits with a real issue date number 6,741.
Outcomes by Issue Year
Each row follows one year's permits to their status on the pull date. Fewer than one in five permits from 2015 through 2017 are still issued. Two years stand out for weak first renewals: permits issued in 2019 renewed at 70.1%, with first expirations falling in 2020, and permits issued in 2024 renewed at 72.9%, with first expirations falling in 2025. The 2025 row is partial, since many of those permits have not reached a first expiration.
| Issue year | Permits | Issued today | Expired | Canceled | Revoked | Share still issued | Renewed at first expiration |
|---|---|---|---|---|---|---|---|
| 2015 | 1,173 | 221 | 763 | 187 | 2 | 18.8% | 88.9% |
| 2016 | 1,288 | 219 | 826 | 232 | 8 | 17.0% | 94.3% |
| 2017 | 1,674 | 293 | 1,163 | 208 | 8 | 17.5% | 79.9% |
| 2018 | 2,180 | 721 | 1,110 | 329 | 10 | 33.1% | 82.8% |
| 2019 | 1,992 | 589 | 1,082 | 303 | 15 | 29.6% | 70.1% |
| 2020 | 924 | 389 | 338 | 180 | 12 | 42.1% | 80.9% |
| 2021 | 1,319 | 800 | 291 | 210 | 14 | 60.7% | 89.8% |
| 2022 | 2,105 | 1,317 | 503 | 232 | 45 | 62.6% | 85.7% |
| 2023 | 1,051 | 617 | 266 | 133 | 25 | 58.7% | 86.8% |
| 2024 | 1,128 | 711 | 309 | 86 | 17 | 63.0% | 72.9% |
| 2025 | 753 | 636 | 90 | 14 | 7 | 84.5% | 87.1% |
| 2026 | 488 | 483 | 0 | 3 | 1 | 99.0% | Not yet due |
Survival by Expiration Number
The weakest point is the second expiration, at 79.1%. Owner-occupied permits fall hardest there, at 74.6%, against 81.6% for not-owner-occupied permits. After that the rate climbs, and from the sixth through the tenth expiration it stays above 90%. Permits that last five years tend to keep going. The table reads across: of the permits counted at that expiration, this share renewed, and this share of all permits is still in force after it.
| Expiration | Permits counted | Renewal rate | Still in force, all | Still in force, owner-occupied | Still in force, not owner-occupied |
|---|---|---|---|---|---|
| 1 | 15,491 | 82.9% | 82.9% | 81.7% | 83.5% |
| 2 | 12,185 | 79.1% | 65.6% | 60.9% | 68.1% |
| 3 | 8,933 | 83.5% | 54.7% | 49.2% | 57.8% |
| 4 | 6,815 | 85.8% | 46.9% | 41.2% | 50.1% |
| 5 | 4,468 | 86.9% | 40.8% | 35.1% | 43.9% |
| 6 | 3,174 | 90.5% | 36.9% | 31.0% | 40.4% |
| 7 | 2,429 | 91.7% | 33.8% | 26.6% | 38.4% |
| 8 | 1,363 | 92.1% | 31.2% | 24.1% | 35.8% |
| 9 | 843 | 91.0% | 28.4% | 21.4% | 33.0% |
| 10 | 477 | 91.6% | 26.0% | 20.3% | 29.7% |
Renewal Rates by Calendar Year
This table sorts each renewal decision into the year the expiration fell due. Rates sank to 74.1% in 2018 and 71.9% in 2020, the first pandemic year, then climbed to 91.5% in 2024. Not-owner-occupied permits reached 94.5% that year, then slipped to 88.9% in 2025 and 89.1% so far in 2026. Owner-occupied permits have trailed since 2023. The file has no reason field, so it cannot say what drove any of these moves. The 2026 row stops at October 4 and can still change if late renewals post after the pull.
| Year due | Decisions | Renewed | Owner-occupied | Not owner-occupied |
|---|---|---|---|---|
| 2016 | 1,167 | 88.9% | 93.0% | 87.0% |
| 2017 | 2,323 | 82.1% | 80.7% | 82.9% |
| 2018 | 3,580 | 74.1% | 75.3% | 73.3% |
| 2019 | 4,831 | 81.8% | 79.4% | 83.5% |
| 2020 | 5,943 | 71.9% | 69.0% | 73.8% |
| 2021 | 5,192 | 78.2% | 77.4% | 78.7% |
| 2022 | 5,379 | 85.3% | 88.3% | 83.7% |
| 2023 | 6,689 | 90.4% | 87.7% | 91.7% |
| 2024 | 7,104 | 91.5% | 85.6% | 94.5% |
| 2025 | 7,622 | 87.3% | 83.6% | 88.9% |
| 2026 (to Oct. 4) | 5,667 | 87.7% | 84.8% | 89.1% |
Building Size and Parcel Type
We also split not-owner-occupied permits by how many distinct units have ever held a permit at the same street address. The largest buildings lose the most at the start: 76.9% renew at the first expiration, against 88.8% at a one-unit address. Later they hold better than any other group, with more than 98% renewing at each of the sixth, seventh and eighth expirations, though only 128 permits have reached the eighth.
Parcel type shows an early gap too. Among not-owner-occupied permits, those on parcels whose ID ends in CO, which the file's lot descriptions show as condominium-style units, renewed at 89.6% at the first expiration. Those on other parcels renewed at 76.7%. The file cannot say why.
| Units at the address | Permits | Renewed at first expiration | Still in force after fourth | Still in force after eighth |
|---|---|---|---|---|
| One unit | 3,140 | 88.8% | 49.4% | 31.2% |
| 2 to 4 units | 1,249 | 89.1% | 58.3% | 41.1% |
| 5 to 24 units | 2,586 | 83.2% | 53.2% | 36.4% |
| 25 or more units | 3,438 | 76.9% | 45.6% | 39.0% |
How Permits End
Expired is the largest group. Among 6,735 measurable expired permits, the median ran two terms, and 2,112 ran only one.
Canceled is next, with 2,114 measurable permits and the same two-term median. A Codes spokesperson told NewsChannel 5 in February 2020 that revoked or canceled permits had been issued in error for some reason. This file has no reason field to test that against, but 1,603 of those canceled permits, about three in four, show more than one term. Metro's operating rules, in a copy archived February 12, 2026, name another path: a change of ownership results in a cancellation.
Revocation is rare and falls mostly on owner-occupied permits: 146 of 164, or 2.58% of all owner-occupied permits ever issued, against 0.17% of the not-owner-occupied group. 154 of the 164 show expiration dates of 2023 or later. Under Chapter 6.28, three violations can cost a holder the permit. Written notice comes 15 days ahead, an appeal goes to a city board, and a revoked holder waits one year to reapply.
New Permits at the Same Address
An ended permit does not always mean an ended rental. Of 8,875 ended permits whose expiration date had passed, 2,432 (27.4%) were followed by a later permit at the same exact address. The next permit came a median of 12.5 days after the old expiration, and 1,137 came before that date.
Where both names are on file, 68.4% of those pairs show a different owner name. Spelling changes inflate that share somewhat, but it fits the rule. Ordinance BL2024-478 spells it out: once the zoning administrator rules that title changed hands, that permit is finished, and a buyer files anew under the rules of that day. Retitling counts too, since Metro's operating rules list a shift between a personal name and an LLC or trust, in either direction.
Counting by address raises the survival figures. Of 1,143 addresses first permitted in 2015, 27.1% hold an issued permit today, against 18.8% of the permits issued that year.
What the buyer can get next turns on zoning. The Nashville Post reports that Metro stopped issuing not-owner-occupied permits in residential zones on January 1, 2022. Metro says existing holders in those zones may qualify to keep renewing, and those permits do not pass to a buyer.
Steps for Owners and Buyers
In the 12 months after the pull, 6,657 issued permits come due, between 491 and 694 in each month from January to October 2027. If some of them are yours, these steps follow from the numbers. None of this is legal advice.
- Keep one renewal calendar for the building. Each unit carries its own permit and often its own date. File when the first Metro notice arrives.
- Do not plan on the 30-day grace period. It is up to the zoning administrator, it needs a reason other than neglect or mistake, and a documented complaint rules it out. Running without a valid permit can mean $50 for each day, and running on a lapsed one can push a new application back six months.
- When buying, assume the seller's permit ends with the sale. Check the parcel's zoning before you count short-term income, because your application will face today's rules. Metro Codes can confirm.
- Guard any residential-zone permit that is not owner-occupied. A replacement is not available in those districts, so a lapse or sale ends that use.
- Talk to Metro Codes and your attorney before retitling. Moving a property into an LLC or trust can void a permit.
- Do not underwrite a permit as permanent. Past permits had about even odds of surviving four expirations. Model a second use, such as longer leases, beside the short-term plan.
What the Data Cannot Show
Read these rates as a record of what happened to past permits. They do not predict what will happen to yours.
- Why a permit ended. There is no reason field, and no date for a cancellation or revocation.
- Whether a rental stopped. WKRN, in an October 18, 2026 story, cited AirDNA's count of over 11,000 advertised Nashville rentals beside a city tally under 7,050 permits. A lapsed permit may not mean a closed rental.
- Whether a rental earned money. The file holds no bookings, occupancy or revenue.
- Exact renewal history. We infer terms from two dates in a single snapshot. Metro may have corrected records over time, and the earliest permits ran under older rules.
- Who holds what. We publish totals only, with no addresses, owners or applicants.
Questions
How many days does one permit term run?
365, counted from the issue date. A first reminder comes 60 days out and a second at 45. A 30-day grace period after the date is up to the zoning administrator, and complaints on record rule it out.
What share of permits get renewed?
82.9% renewed at their first expiration and 79.1% at their second. From 2023 through 2025, between 87.3% and 91.5% of the permits due each year renewed, based on Metro's file as pulled November 3, 2026.
What happens to the permit at a sale?
It ends. BL2024-478 puts the buyer back at square one under the rules of that moment. Residential zones offer no new permit of the not-owner-occupied type. Metro Codes can rule on your parcel.
What does canceled mean in Metro's file?
The file does not define it and gives no date or reason. A Codes spokesperson told NewsChannel 5 in February 2020 that revoked or canceled permits had been issued in error for some reason, and Metro's operating rules say a change of ownership results in a cancellation. Of the canceled permits we could measure, 1,603 of 2,114 show more than one term.
Why do some counts of expired permits run higher than yours?
A raw count of expired rows gives 8,041. Of those, 1,300 have no issue date and look like lapsed applications. We count 6,741 expired permits that were issued.
Sources
- Metro Nashville Residential Short Term Rental Permits, ArcGIS open data, pulled November 3, 2026
- Metro Code Chapter 6.28, Municode (version current through June 23, 2026)
- Metro Codes, Renew a Short Term Rental Property Permit (archived copy, October 12, 2026)
- Metro Codes, Renew a Short Term Rental Property Permit (archived copy, October 22, 2026)
- Metro Codes, Permit Types (archived copy, February 17, 2026)
- Metro Codes, Operation Requirements (archived copy, February 12, 2026)
- Metro Council ordinance BL2024-478, Legistar
- NewsChannel 5, Data shows growth of short-term rentals in Nashville, February 27, 2020
- WKRN, Metro Nashville cracking down on short-term rentals, October 18, 2026
- Nashville Post, Housing stock needs drive short-term rental regulation, October 23, 2025
Checked November 5, 2026.
Cite this study
- Title
- How Long Nashville Short-Term Rental Permits Last
- Publisher
- Rad Stay, Nashville
- Data pulled
- November 3, 2026
- Published
- November 5, 2026
- Address
- https://rad-stay.com/research/how-long-nashville-str-permits-last/
Rad Stay. "How Long Nashville Short-Term Rental Permits Last." Published November 5, 2026. Data: Metro Nashville Residential Short Term Rental Permits, open data, pulled November 3, 2026. https://rad-stay.com/research/how-long-nashville-str-permits-last/
To keep this page, print it or choose Save as PDF in your browser's print window. The printout keeps the sources and the date.
More research
All 6Local and Out-of-State Short-Term Rental Permit Holders in Nashville
On November 3, 2026, Metro Nashville's public records showed 6,996 short-term rental permits in issued status.
Multi-Unit Buildings With Short-Term Rental Permits in Nashville
More than half of Nashville's issued short-term rental permits share a street address with at least one other permit.
Nashville Short-Term Rental Permit Census
Metro Nashville's public register held 17,603 distinct short-term rental permit records on November 3, 2026.









